Standard Construction Details

Detail No. Detail Name Latest Revison Date

Water Details
 
1.1 Typical Trench - Water Main June 2015
1.2 Fire Hydrant Assembly February 2017
1.3 Vertical Gate Valve Assembly June 2015
1.4 Horizontal Gate Valve Assembly June 2015
1.5 Butterfly Valve Assembly June 2015
1.6.1 1 Inch Combination Air Valve June 2015
1.6.2 2 Inch Combination Air Valve June 2015
1.7 Tapping Valve And Sleeve February 2016
1.8 Cut-In Gate Valve June 2015
1.9 1" Water Service March 2017
1.10 1.5" Inch Water Service March 2017
1.11 2" Inch Water Service March 2017
1.12 3" Inch Water Service March 2017
1.13 4" Inch Water Service March 2017
1.14 Proposed Waterline Connection To Existing Waterline June 2015
1.15 Tie-In Anchor Blocking June 2015
1.16 Water Main Vertical Change for Crossing Conflict March 2016
1.17 Valve Box Installation June 2015
1.18 Valve Box Abandonment June 2015
1.19 Water Meter Below Ground Enclosure June 2015
1.20.1 Water Meter Vault March 2017
1.20.2 Water Meter Above Ground Enclosure April 2017
1.21.1 Fire Vault June 2015
1.21.2 Fire Vault - Alt. 1 June 2015
1.22 Actuator Valve Vault June 2015
1.23 Pressure Reducing Valve Vault June 2015

Sanitary Sewer Details  
2.1 Typical Trench - Sanitary Sewer June 2015
2.2 Backfill Classes For Sewer Pipe Installation June 2015
2.3 Precast Manhole March 2016
2.4 Drop Manhole June 2015
2.5 Doghouse Manhole March 2016
2.6 Force Main To Gravity Manhole March 2016
2.7.1 Manhole Frame And Cover - Onsite June 2015
2.7.2 Manhole Frame And Cover - Offsite October 2015
2.8 Sanitary Sewer Cleanout March 2016
2.9 Backwater Valve October 2015
2.10 Proposed Sewer Crossing Existing Water Main June 2015
2.11 Manhole Abandonment June 2015

Water and Sanitary Sewer Details  
3.1 Jack And Bore (Water And Sewer Mains) June 2015
3.2.1 Restrained Lengths For Horizontal Bends June 2015
3.2.2 Restrained Lengths For Vertical Bends June 2015
3.2.3 Restrained Lengths For Tees June 2015
3.2.4 Restrained Lengths For Reducers June 2015
3.2.5 Restrained Lengths For Dead Ends And Inline Valves June 2015
3.3 Concrete Collar For Valve and Manhole On Site June 2015
3.4 Typical Vault  June 2015
3.5 Manhole Step June 2015

Miscellaneous Details  
4.1.1 AUD Road Cut Detail March 2016
4.1.2 AED Utility Road Cut Detail February 2016
4.2 Typical Trench - For Future Path Microduct June 2015
4.3 Detector Tape March 2016
4.4 Grease Interceptor February 2017
4.5 Three Stage Oil / Grit Interceptor June 2015
4.6 Typical Water & Sewer Utility Location December 2015
4.7 Typical Lot Layout December 2015

Backflow Prevention Details   
5.1 Backflow Preventer Vault June 2015
5.2 Double Check Valve Assembly (3" And Smaller) February 2016
5.3 Double Check Valve Assembly Variations (3"  And Smaller) June 2015
5.4 Double Check Valve Foundation Variations (3" And Smaller) June 2015
5.5 Reduced Pressure Zone (RPZ) Assembly June 2015
5.6 RPZ Above Ground Enclosure Or Double Check Assembly Properties June 2015
5.7 Above Ground Enclosure Drain Detail June 2015
5.8 Dual Check Assembly Installation Detail June 2015