Standard Construction Details

Detail No. Detail Name Latest Revison Date
Water Details
1.1 Typical Trench - Water Main January 2018
1.2 Fire Hydrant Assembly January 2018
1.3 Vertical Gate Valve Assembly January 2018
1.4 Horizontal Gate Valve Assembly January 2018
1.5 Butterfly Valve Assembly January 2018
1.6.1 1 Inch Combination Air Valve January 2018
1.6.2 2 Inch Combination Air Valve January 2018
1.7 Tapping Valve And Sleeve January 2018
1.8 Cut-In Gate Valve January 2018
1.9 1" Water Service January 2018
1.10 1.5" Inch Water Service January 2018
1.11 2" Inch Water Service January 2018
1.12 3" Inch Water Service January 2018
1.13 4" Inch Water Service January 2018
1.14 Proposed Waterline Connection To Existing Waterline January 2018
1.15 Tie-In Anchor Blocking January 2018
1.16 Water Main Vertical Change for Crossing Conflict January 2018
1.17 Valve Box Installation January 2018
1.18 Valve Box Abandonment January 2018
1.19 Water Meter Below Ground Enclosure January 2018
1.20.1 Water Meter Vault January 2018
1.20.2 Water Meter Above Ground Enclosure January 2018
1.20.3 Double Detector Check Valve Assembly Fire Line Above Ground Enclosure January 2018
1.20.4 Reduced Pressure Detector Check Valve Assembly Fire Line  Above Ground Enclosure January 2018
1.21.1 Fire Vault January 2018
1.21.2 Fire Vault - Alt. 1 January 2018
1.22 Actuator Valve Vault January 2018
1.23 Pressure Reducing Valve Vault January 2018
Sanitary Sewer Details
2.1 Typical Trench - Sanitary Sewer January 2018
2.2 Backfill Classes For Sewer Pipe Installation January 2018
2.3 Precast Manhole January 2018
2.4 Drop Manhole January 2018
2.5 Doghouse Manhole January 2018
2.6 Force Main To Gravity Manhole January 2018
2.7.1 Manhole Frame And Cover - Onsite January 2018
2.7.2 Manhole Frame And Cover - Offsite January 2018
2.8 Sanitary Sewer Cleanout January 2018
2.9 Backwater Valve January 2018
2.10 Proposed Sewer Crossing Existing Water Main January 2018
2.11 Manhole Abandonment January 2018
Water and Sanitary Sewer Details
3.1 Jack And Bore (Water And Sewer Mains) January 2018
3.2.1 Restrained Lengths For Horizontal Bends January 2018
3.2.2 Restrained Lengths For Vertical Bends January 2018
3.2.3 Restrained Lengths For Tees January 2018
3.2.4 Restrained Lengths For Reducers January 2018
3.2.5 Restrained Lengths For Dead Ends And Inline Valves January 2018
3.5 Manhole Step January 2018
Miscellaneous Details
4.1.1 AUD Road Cut Detail January 2018
4.1.2 AED Utility Road Cut Detail January 2018
4.2 Typical Trench - For Future Path Microduct January 2018
4.3 Detector Tape January 2018
4.4 Grease Interceptor January 2018
4.5 Three Stage Oil / Grit Interceptor January 2018
4.6 Typical Water & Sewer Utility Location January 2018
4.7 Typical Lot Layout January 2018
Backflow Prevention Details 
5.1 Backflow Preventer Vault January 2018
5.2.1 Double Check Valve Assembly (2" And Smaller) January 2018
5.2.2 Double Check Valve Assembly (2" And Smaller) January 2018
5.3 Double Check Valve Assembly Variations (2"  And Smaller) January 2018
5.4 Double Check Valve Foundation Variations (2" And Smaller) January 2018
5.5 Reduced Pressure Zone (RPZ) Assembly January 2018
5.6 RPZ Above Ground Enclosure Or Double Check Assembly Properties January 2018
5.7 Above Ground Enclosure Drain Detail January 2018
5.8 Dual Check Assembly Installation Detail January 2018